Point of Connection

Jump to…
Point of Connection Documents >

Green Tech Point of Connection

The SiteOne Green Tech Point of Connection Assemblies set the standard for pre-packaged installations. The pre-fabricated assembly ships in a durable, vandal resistant, heavy duty valve box. The contractor simply sets the valve box assembly, connects the inlet/outlet piping, and connects the wiring to the master valve/flow sensor.

Key Features

• 5-year warranty on products and assembly

• All stainless steel fasteners with torque per manufacturer’s recommendations

• Shipped to site in a vault package with protection packing

• Prefabrication ensures an accurate fit

• Contractor connects to inlet and outlet for easy installation

Point of Connection Documents